Fort Jackson Advanced Individual Training Barracks
- April 20, 2015
- Posted by: admin22
- Category:
No Comments
Steel Fabrication .
Acadian has provided Steel fabrication and Erection services for the construction of three, three-story, 93,000 square-foot barracks facilities. The barracks are an integral part of the Advanced Individual Training (AIT) Company Operations Facility, and provide a residential community for soldiers.
PRECONSTRUCTION SERVICES
- Assuming responsibility for steel fabrication means, methods, sequencing and procedures
- Providing cost, quality, inventory control transparency, monitoring and reporting
- Holding on-going project meetings with client and trades to monitor job progress
- Scheduling, delivery, receipt and proper storage of all long lead systems and materials.
GENERAL CONSTRUCTION PROJECTS
PROJECT DETAILS
General Contractor: | |
Tonnage: | 200 MT |
Location: | Fort Jackson, South Carolina |
Completion of the project: | 2014 |