Fort Jackson Advanced Individual Training Barracks

Steel Fabrication .

Acadian has provided Steel fabrication and Erection services for the construction of three, three-story, 93,000 square-foot barracks facilities. The barracks are an integral part of the Advanced Individual Training (AIT) Company Operations Facility, and provide a residential community for soldiers.

PRECONSTRUCTION SERVICES

  • Assuming responsibility for steel fabrication means, methods, sequencing and procedures
  • Providing cost, quality, inventory control transparency, monitoring and reporting
  • Holding on-going project meetings with client and trades to monitor job progress
  • Scheduling, delivery, receipt and proper storage of all long lead systems and materials.

GENERAL CONSTRUCTION PROJECTS

PROJECT DETAILS

General Contractor:
Tonnage: 200 MT
Location: Fort Jackson, South Carolina
Completion of the project: 2014